REBAR · CONCRETE · BLOCKWORK
Bendline calculates rebar bar-bending schedules, concrete mix quantities and blockwork takeoffs — across IS 456, ACI 318 and BS 8666 — so you can stop re-deriving the same numbers on-site.
Beams, columns (rectangular or circular), slabs with openings, footings — bend deductions and hook allowances by code.
Volume in, cement bags / sand / gravel out, using the standard dry-volume method contractors use on site.
Wall area minus openings, block count with wastage, mortar cement and sand — 6" or 9" block.
IS 456, ACI 318, or BS 8666 (Nigeria defaults) — per project, switchable any time.
Dimensions, bar sizes, spacing — or a wall area, or a concrete volume and mix ratio.
A running schedule you can save, cost out, optimize for cutting waste, and export.
Reach engineers, contractors, builders and construction professionals using our calculators.