Bendline

REBAR · CONCRETE · BLOCKWORK

Site quantities, worked out to the last bar and the last bag.

Bendline calculates rebar bar-bending schedules, concrete mix quantities and blockwork takeoffs — across IS 456, ACI 318 and BS 8666 — so you can stop re-deriving the same numbers on-site.

BEAM B1 — SECTION A-ASCALE 1:10 · BS 8666REV 0323045025mm COVER

Three calculators, one bill of quantities.

Rebar & BBS

Beams, columns (rectangular or circular), slabs with openings, footings — bend deductions and hook allowances by code.

Concrete mix

Volume in, cement bags / sand / gravel out, using the standard dry-volume method contractors use on site.

Blockwork

Wall area minus openings, block count with wastage, mortar cement and sand — 6" or 9" block.

How it works

01

Pick your code

IS 456, ACI 318, or BS 8666 (Nigeria defaults) — per project, switchable any time.

02

Enter member details

Dimensions, bar sizes, spacing — or a wall area, or a concrete volume and mix ratio.

03

Get a sign-off sheet

A running schedule you can save, cost out, optimize for cutting waste, and export.

Free to start. No card required.

Create your account

Advertise with us

Reach engineers, contractors, builders and construction professionals using our calculators.

Become a Sponsor →